Loughborough College Institute of Technology
Loughborough
The Design
With a gross internal floor area of over 1452m2, the new centre will enable the provision of a range of specialist laboratories and computing suites, supporting a wide range of engineering disciplines with an emphasis on sustainable engineering practice. These will be supported by a number of flexible general teaching and seminar spaces. Self guided study and collaboration space will also be provided, this being an essential part of the Institute of Technology’s ethos to foster innovative teaching and learning, interdisciplinary working, and engagement with industry and employer partners.
The Outcome
Developed in collaboration with the University of Loughborough, the proposed new IoT facility is a critical part of the vision to support the development of higher level technical skills focused on the needs of industry. The building is currently in RIBA stage 5 and we expect completion spring 2025.