AES AESSEAL Ltd

Created on a brownfield site, the brief for this £4.5 million, four phase project, was to produce a “quietly elegant” industrial building with high quality internal spaces throughout.

 The main building was designed as a portal framed structure including a 9m wide linear band of two storey offices.  Reception is a two storey void with a balcony doubling as a corridor at high level.

 A later phase of the project included the introduction of an environmentally sensitive wetlands area as part of a sustainable drainage scheme.

Download the Case Study Sheet (pdf)